Constraints

Recently Published Constraints Data

Download the latest reports on binding constraints in the Day-Ahead Energy Market and during the operating day.
 

A constraint is the maximum level a transmission system facility (or facilities) can operate to respect the most restrictive of its thermal, stability, and voltage limits. A constraint becomes "binding" when it limits the power flow between locations, which can lead to dispatch of units out of economic-merit order, potentially affecting the spot price.
 

 
Day-Ahead Binding Constraints
More >
Description Timestamp Download
April 11, 2021 04/11/2021 11:00 PM EDT CSV
April 10, 2021 04/10/2021 11:00 PM EDT CSV
April 09, 2021 04/09/2021 11:00 PM EDT CSV
April 08, 2021 04/08/2021 11:00 PM EDT CSV
April 07, 2021 04/07/2021 11:00 PM EDT CSV
 
Preliminary Real-Time Binding Constraints
More >
Description Timestamp Download
Current 04/10/2021 07:07 PM EDT CSV
April 09, 2021 04/09/2021 11:57 PM EDT CSV
April 08, 2021 04/08/2021 11:57 PM EDT CSV
April 07, 2021 04/07/2021 11:57 PM EDT CSV
April 06, 2021 04/06/2021 11:57 PM EDT CSV
 
Preliminary Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 06/02/2017 09:42 AM EDT CSV
June 01, 2017 06/01/2017 11:30 PM EDT CSV
May 31, 2017 05/31/2017 11:27 PM EDT CSV
May 30, 2017 05/31/2017 09:07 AM EDT CSV
May 29, 2017 05/29/2017 11:27 PM EDT CSV
 
Final Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/09/2021 11:00 PM EDT CSV
April 08, 2021 04/08/2021 11:00 PM EDT CSV
April 07, 2021 04/07/2021 11:00 PM EDT CSV
April 06, 2021 04/06/2021 11:00 PM EDT CSV
April 05, 2021 04/05/2021 11:00 PM EDT CSV
 
Final Real-Time Five-Minute Binding Constraints
More >
Description Timestamp Download
Current 06/01/2017 11:18 AM EDT CSV
May 30, 2017 05/31/2017 11:56 AM EDT CSV
May 29, 2017 05/30/2017 02:34 PM EDT CSV
May 28, 2017 05/30/2017 02:27 PM EDT CSV
May 27, 2017 05/30/2017 11:59 AM EDT CSV