Last update: 09/05/2018
ISO New England undertakes many projects and initiatives in collaboration with stakeholders for the continued development of the region’s wholesale electricity markets. Listed below are upcoming major projects that may affect your organization over the next 12 months. Projects are added as they are scheduled; in some cases projects are scheduled and implemented in a shorter timeframe and may be added to the list close to their target launch. This page is generally updated on a monthly basis, though more frequent updates may be made in response to a significant change in the project plan.
Click the names of near-term projects to see details on the project and actions required, as well as links to training materials and other resources.
Click here to subscribe to the Customer Readiness mailing list to receive notifications when this page or the near-term project pages are updated. Hit send when the subscription email opens up.
To follow the course of proposed projects and initiatives from introduction to implementation, see the Wholesale Markets Project Plan page and Key Project pages.
Project | Target Launch | Customers Affected | System Affected | Scope of Change | Competitive Auctions with Sponsored Policy Resources (CASPR) Implement a substitution auction (SA) to be run after the primary Forward Capacity Auction (FCA) to coordinate the entry of new sponsored policy resources (SPRs) with the exit of older existing capacity resources willing to permanently retire; this pairing of entry and exit minimizes the impact that SPRs have on competitively-based capacity prices, maintains resource adequacy, and reduces over-supply concerns |
February 4, 2019 | Forward Capacity Auction participants with one of the following:
|
Forward Capacity Tracking System (FCTS) | Participants requesting to qualify a new resource as an SPR will use FCTS to:
|
---|---|---|---|---|
Financial Assurance Management System (FAM) | FAM will be updated to determine exposure and adjust the FA requirement as necessary for the following:
|
|||
Substitution Auction | Participants with a new SPR will be prevented from electing a multi-year CSO and capacity clearing price for any capacity that clears in the SA Participants with an existing resource that will participate in the SA as demand will be prevented from:
The demand bid from an existing resource that exceeds the CSO awarded to that resource in the primary FCA will be reduced to equal the awarded CSO. |
|||
MIS | FCA Auction Results MIS Report will be updated to include results from the SA. |
Project | Target Launch | Customers Affected | System Affected | Scope of Change | Energy Storage Device (ESD) Allow participants to register a single energy storage asset as an Alternative Technology Regulation Resource (ATRR), a non-regulation capable generator, and a dispatchable-asset-related demand (DARD) asset in order to offer its full range into the regulation market while maintaining its ability to operate as a dispatchable energy market resource |
March 31, 2019 | Participants with grid-sized storage technologies and generators monitoring RTU failure–to-follow data | eMarket |
|
---|---|---|---|---|
Remote Terminal Unit (RTU) |
|
|||
Settlements |
|
|||
MIS Reports |
|
|||
Balance of Planning Period: Financial Assurance (BOPP FA) Implement a balance-of-planning-period monthly auction structure for Financial Transmission Rights (FTRs) and adjust associated financial assurance calculations |
TBD | Market participants eligible to bid in the Financial Transmission Rights market | Financial Assurance Management (FAM) | FTRs that have the same path, class, and month but were awarded in different auctions may be netted for financial assurance calculations to avoid “double-margining”; unsettled FTR financial assurance will be introduced; and the pre-awarded/award auction obligation will be removed. |
Financial Transmission Rights UI (eFTR) | The eFTR sandbox will be updated prior to go-live. Upload and download processes may be tested using formatted CSV files, and add, modify, and delete processes may be tested in the user interface. | |||
Annual Reconfiguration Transactions (ARTs) are designed to provide the equivalent of a bilateral transfer of a capacity supply obligation (CSO) at a fixed price. By entering into an ART and participating in an annual reconfiguration auction, a capacity supplier can achieve price-quantity assurance (to the extent the capacity is substitutable) when either acquiring or shedding a CSO. | Q2 2019 | Participants and their counterparties seeking to acquire or shed CSO with price certainty | ISO New England SMD Application: Forward Capacity Market Reconfiguration Auction User Interface | Enhancements to include:
|
Financial Assurance Management (FAM) | Financial exposure from ARTs will be included in financial assurance obligations. | |||
Market Information Server (MIS) | The existing ARA report will be enhanced to include information about each confirmed ART. | |||
Update Enhanced Energy Scheduling (EES) Technical Architecture Create a new user interface for customers to submit external transactions and assign subaccounts; replace the JAVA Applet architecture to improve system performance |
Q3 2019 | All Enhanced Energy Scheduling (EES) software users | Enhanced Energy Scheduling (EES) | The new customer interface will be named New England External Transaction Tool and will be referred to using the acronym “NEXTT.” Retire the use of EES Java Applet architecture and replace the current EES user interface with a new customer submittal platform. |
WebServices | New file formats for data uploads and downloads will be available. | |||
CAMS Subaccounts | Subaccounts created in CAMS will be available for assignment in the NEXTT user interface. (See the Divisional Accounting project for more information on subaccounts). | |||
MIS | Participants will be able to utilize existing informational Market Information Server (MIS) reporting by subaccount. (See the Divisional Accounting project for more information on subaccounts). |
Project | Launched | Customers Affected | System Affected | Scope of Change | |
---|---|---|---|---|---|
Customer Contact Center Solution (CCCS) Replace the current Ask ISO platform to improve customer-issue management and contact identification by integrating voice, email, and case-tracking systems, as well as to address business continuity goals |
August 27, 2018 | All customers and stakeholders submitting inquiries to ISO New England via phone, email, or Ask ISO | Ask ISO | Users submitting inquiries directly to the Ask ISO application will be able to access the system with their unique email and password, instead of with the existing digital certificate access process. A self-service support community will be available to allow users to search knowledge articles for frequently asked questions, to submit inquiries, and to categorize issues to expedite system access and issue routing. |
|
CAMS | Phone, email, and other contact data will be shared between the Customer and Asset Management System (CAMS) and Ask ISO to create user accounts and update contact information. Security Administrators are encouraged to review CAMS Persons records ahead of this release, particularly phone numbers and e-mail addresses. | ||||
Price-Responsive Demand (PRD) Project Fully integrate demand response resources (DRRs) to participate in the energy and reserve markets and to be eligible for Forward Capacity Market (FCM) shortage event penalties or credits, as well as peak energy rents |
Q2 2018 | Market participants and demand-designated entities (DDEs) with demand response (DR) assets | Customer and Asset Management System (CAMS) | DR entities will be assigned new asset and resource IDs to be converted to the three-level PRD entity model:
Scheduled and forced curtailments for DRAs will be submitted in CAMS The new DRR IDs and the converted DRA IDs will automatically be assigned to the default subaccount. Participants that choose to use subaccount reporting for these entities will assign subaccounts at go-live. |
|
eMarket | New displays specific to DRRs will be available in the user interface (UI). Using the eMarket UI, DR market participants will:
|
||||
Remote terminal unit (RTU) | RTUs will be upgraded and tested prior to go-live. The desired dispatch point (DDP) for each DRR will be included in the data to convey the requested consumption reduction below the DRR’s adjusted baseline. |
||||
DR Audit and Testing Tool (DRATT) | Beginning in early May 2018, DR audits will be put on hold but requests will continue to be accepted for audits commencing June 1, 2018, or later. | ||||
ISO New England SMD Applications | Real-time demand response (RTDR) and real-time emergency generation (RTEG) will be removed from the Meter Reader UI. | ||||
Demand Response Market User Interface (DRMUI) | The DRMUI will allow download of three baseline types (weekday, Saturday, Sunday/Holiday), baselines for prior days, interval performance data by asset, and interval performance data by resource. | ||||
Baseline calculations | Baseline calculations for Saturdays and Sunday/DR holidays will use the five most recent uninterrupted like-days during the past 42 days rather than non-holiday weekdays as implemented June 1, 2017. | ||||
Forward Capacity Tracking System (FCTS) | Existing DR field labels in the UI will be updated to new PRD terms which will also display in historical views with the old DR data model. | ||||
Settlements | DR will be settled via the established two-settlement process where RT market quantities are used to determine participants’ actual operation deviations from their day-ahead (DA) energy positions. Real-time Net Commitment-Period Compensation hourly shortfall will be introduced. |
||||
Market Information Server (MIS) | New reports will be introduced as well as others being retired. | ||||
Web services and web publishing | New eMarket WebServices upload/download and XML functionality for DRRs will utilize new DRR terminology. The Morning Report will include DRR capacity. |
||||
Forward Capacity Market Pay-for-Performance (FCM PFP) Replace the FCM availability metric with a performance metric based on measurable energy delivered and reserves provided |
Q2 2018 | Lead market participants for all resources | Financial Assurance Management (FAM) | The potential for resources with capacity supply obligations (CSOs) to have negative capacity payments under the new PFP rules will be collateralized by adding a financial assurance requirement for Forward Capacity Market delivery. | |
Settlements |
|
||||
Forward Capacity Tracking System (FCTS) | Lead participants of passive resources will submit a show of interest (SOI) to be eligible for capacity performance payments (CPPs) when performing during a scarcity condition. (The eligibility for CPPs to be paid for external transactions, generators, and demand response resources that are not mapped to a resource will be determined through the settlement process.) | ||||
Enhanced Energy Scheduler (EES) | Flex reservations will no longer be an option. | ||||
ISO New England SMD Applications |
|
||||
Web services | A new scarcity conditions report will be available. | ||||
Market Information Server (MIS) | New reports will be introduced and others will be retired. | ||||
Subhourly Settlements (SHS) Transition the settlement interval from hourly to every five minutes to align with the real-time dispatch instruction and pricing intervals for the Real-Time Energy Market, Regulation Market, Net Commitment-Period Compensation (NCPC), and reserve markets for generators, load resources, and external transactions |
Implemented phases:
|
Lead market participants submitting Roseton node external transactions, owners of resources that can respond quickly to dispatch instructions, data-scrapers using HTML client programs, and meter reading submitters | Meter reading CSV and XML upload and download files |
|
|
Meter reading HTML client programs | Meter reading HTML client programs used for data-scraping must be upgraded to use XML RESTful web services. | ||||
Market Information Server (MIS) | MIS reports will be updated to provide settlement details with five-minute granularity for real-time energy, reserves, regulation capacity, regulation service, and real-time NCPC. A new energy quantity report will be developed. | ||||
Web services | New end point URLs will be available to download preliminary of final:
|
||||
ISO Express | Revised pricing reports and preliminary and final grid reports will be downloadable in a CSV format for:
|
||||
Settlements | The new dispatch lost-opportunity cost (dispatch LOC) NCPC calculation will be introduced for resources that are not providing regulation or postured during the interval. Beginning December 1, 2017 introduce five-minute interval settlement for regulation capacity and regulation service. |
||||
Internal Market Monitor Asset Characteristics (IMMAC) UI Allow customers to submit asset characteristics data directly to the ISO’s Internal Market Monitor (IMM) and view current data on file with the IMM via the Customer and Asset Management System (CAMS) |
July 11, 2017 | Lead market participants with generator assets, except for settlement only generators | CAMS | To use the new IMMAC module in CAMS, affected participants must have an active ISO-NE certificate and be assigned the maintainer or viewer role. | |
Streamline Asset Registration – Relationship Management (SAR – RM) Create a new module to submit asset ownership transfers and view meter reader and lead market participant asset relationships |
Implemented July 11, 2017: allow participants to view Meter Reader and Lead Market Participant asset relationships Implemented June 28, 2016: add Asset Registration tab and allow participants to submit ownership transfers |
All customers processing asset relationship transfers between owners, meter readers and lead market participants | CAMS | To use the new application, affected participants must have an active ISO-NE certificate and arrange to have the application role assigned in the Customer and Asset Management System (CAMS). | |
Do Not Exceed (DNE) Dispatch Wind and intermittent hydro resources may operate up to a do not exceed limit and will be dispatchable in real time; project excludes solar resources at this time |
Implemented April 30, 2017: intermittent hydro required Implemented May 25, 2016: wind required, intermittent hydro optional |
Lead market participants of wind and intermittent hydro units with a capacity supply obligation (CSO) or that are qualified generator reactive resources | CROW | Affected market participant must begin submitting outage requests into the Control Room Operations Window (CROW) Outage Scheduler application when an outage will reduce the real-time high operating limit (RTHOL) below its CSO or the available voltage amperes reactive (VAR) will be below qualified VAR. | |
Lead market participants and designated entities with wind and intermittent hydro resources | RTU | Remote terminals units (RTUs) must be installed or upgraded for all do-not-exceed dispatchable generators (DDGs). | |||
MIS | Affected participants will see DNE-specific values and column heading updates added to MIS reports | ||||
June, 2019 | Lead market participants of wind and intermittent hydro units with CSOs | eMarket | Because Day-Ahead Energy Market participation will be required for DDGs with CSOs, affected market participants must arrange access to eMarket, the software platform used to submit required data and retrieve the day-ahead clearing results. | ||
Real-Time Fast-Start Pricing (FSP) Improve the Real-Time Energy Market’s pricing logic to enable fast-start resources to set price more frequently |
March 1, 2017 | Lead market participants with fast start generators or demand-response resources, flexible DNE dispatchable generators, and certain dispatchable-asset-related demand resources | Settlements | A new lost-opportunity cost calculated in real-time will be paid to units that are moved out of merit due to fast-start resources. | |
Market Enhancements for DARD Pumps New modeling practices and bidding parameters to better reflect dispatchable-asset-related demand (DARD) operating characteristics in offer data and economic dispatch |
March 1, 2017 | Lead market participants with pump storage hydro-generating resources | eMarket and related web services | New bidding parameters (submit):
New resource modeling parameters (view-only):
New NCPC type parameters:
|
|
Settlements | Day-ahead and Real-time Net Commitment-Period Compensation (NCPC) settlements will be modified to include NCPC payment calculations for DARD pumps, including NCPC dispatch lost opportunity cost. | ||||
Interconnection Request Tracking Tool Elective Transmission Upgrades (IRTT ETU) Replace the Interconnection Request Tracking Tool (IRTT) with an improved version for use by participants to submit interconnection requests |
February 17, 2017 | Customers and project proponents with new or existing interconnection requests (IRs) for generators or Elective Transmission Upgrades (ETUs) | IRTT | The new version of the IRTT will be improved and enhanced to enable online submittal for ETU IRs. Existing data, user names, and passwords will be migrated to the new application automatically. | |
Participant One-line Diagram Submissions Modify the NX912D Application (NX-9 and NX-12D) for participants to submit one-line schematic diagrams and area overviews |
December 20, 2016 | Transmission owners of substations with a rating of 69 kV or higher, or as required per ISO Operating Procedure No. 16 (OP 16), Transmission System Data, and lead market participants with generators participating in the Real-Time Energy Market | NX912D | Current participant schematics and overviews will be required for initial load prior to production releases. | |
CAMS | New roles will be available in the Customer and Asset Management System (CAMS) for access to view and submit to the sandbox and production environments. | ||||
Generator Dynamics Data Management A new system for uploading and updating detailed technical information about the physical and operational characteristics of power system equipment |
May 14, 2016 | Lead market participants and nonparticipants required to report and certify generator dynamics data | CTM/DDMS | Affected market participants and nonparticipants must access the Dynamics Data Management System (DDMS) section of the Customer Ticket Management (CTM) application to report and certify generator dynamics data. | |
CAMS | In the Customer and Asset Management System (CAMS), the company security administrator must assign the contact type Generation Compliance Contact Primary and grant access to the Customer Ticket Management/DDMS Compliance Officer role to the proper users. | ||||
Divisional Accounting (Subaccounts) User-defined subaccounts were enabled to allow customers to segregate their settlement reporting by assigning assets and resources directly to a subaccount and assigning other activity-based transactions to subaccounts in various applications |
Multiple Phases |
Market participants who are interested in using divisional accounting to segregate the reporting of their market activity by specific settlement subaccounts | CAMS | Participants can create subaccounts, assign assets and resources, and add subaccount reporting in the Customer and Asset Management System (CAMS). | |
eMarket | Participants can assign subaccounts to transactions in the eMarket application. | ||||
Internal Transactions UI | Participants can assign subaccounts to transactions in the Internal Transactions user interface. | ||||
FCTS | Participants can assign subaccounts to self-supply requests in the Forward Capacity Tracking System (FCTS). | ||||
MIS | Participants can create new informational Market Information Server (MIS) reporting by subaccount. | ||||
NEXTT (to replace EES in Q3 2019) | Participants will be able to assign subaccounts to external transactions using NEXTT user interface | ||||
Coordinated Transaction Scheduling (CTS) Enhanced scheduling procedures were enabled for external transactions at the Roseton interface, which allow market participant to submit a unified real-time bid to simultaneously purchase and sell energy on each side of the interface, with the bid price indicating the price difference between the two regions that the participant is willing to accept |
December 15, 2015 | Market participants transacting at the Roseton interface between ISO New England and the New York ISO | JESS | Affected participants must follow the process to get access to and create a password for the New York ISO Joint Energy Scheduling System (JESS) in order to submit external transactions at this interface. | |
All Enhanced Energy Scheduler (EES) software users | EES | Affected participants can now select an eTag ID and link it to the EES schedule. | |||
All market participants using pricing data | MIS | Affected participants can now access Market Information Server (MIS) reporting that include 15-minute pricing and constraints. | |||
Market participants using pricing data for Roseton pricing node 4011 | Selectable pricing reports | Affected participants can now choose to see 15-minute pricing and constraints data in selectable ISO Express reports, such as the Selectable Day-Ahead and Real-Time Hourly Demand Report. | |||
Market participants using pricing data for Roseton pricing node 4011 | Web services | Affected participants can now access new endpoints for CTS in the ISO’s web services data. |